SY BBA
Class:- SY BBA SEM- III
Subject:- Production and Material Management
UNIT-1
3. Project System of Production
Unit-2
1. Production Planning and Control
2. Production planning control. Book chapter
3. Work Study
4. Unit-2. Part.1 PERT and CPM
5.PERT and CPM- Theory and Sum
6. PERT and CPM - SUM Calculated.
Unit-3
Below given all Link for sum of transportation problem.
2. NCM, LCM, Vogel Methods Sum Calculation ---With Answer
3. Transportation Problem- SUM
4. Vogel, penalty regret method of transportation
5. Unbalanced transportation problem
6. Modified Distribution method. (MODI method)/ Optimal solution method.
UNit-4
2. Unit-4 Part-2
3. Inventory control- Read this material for chapter inventory control.
4. Unit-4 Part-3 only Read 1st and 8 No question.. In this material.
Class:- SY BBA SEM-III
Subject:- E- commerce
E- Commerce Whole Material
0 Comments