SY BBA SEM - III ( Production and Material Management )( E- Commerce )

SY BBA

Class:- SY BBA SEM- III

Subject:- Production and Material Management 


UNIT-1

1. Unit-1 --Click Here  

2. Unit-1. Part-2

3. Project System of Production


Unit-2

1. Production Planning and Control

2. Production planning control. Book chapter

3. Work Study

4. Unit-2. Part.1 PERT and CPM

5.PERT and CPM- Theory and Sum

6. PERT and CPM - SUM Calculated.


Unit-3 

1. Plant Location and Layout


Below given all Link for sum of transportation problem.

2. NCM, LCM, Vogel Methods Sum Calculation ---With Answer

3. Transportation Problem- SUM

4. Vogel, penalty regret method of transportation

5. Unbalanced transportation problem

6. Modified Distribution method. (MODI method)/ Optimal solution method.

7. Modi method-sum calculated

8.Sum- Transportation Problem

2. Latest MODI method -SUM


UNit-4

1. Unit-4 Part-1

2. Unit-4 Part-2

3. Inventory control- Read this material for chapter inventory control.

4. Unit-4 Part-3 only Read 1st and 8 No question.. In this material.


Class:- SY BBA SEM-III

Subject:- E- commerce 

 

E- Commerce Whole Material 


Click Here for material

Post a Comment

0 Comments

Close Menu